{"id":433,"date":"2023-01-27T08:56:39","date_gmt":"2023-01-27T08:56:39","guid":{"rendered":"https:\/\/ysa.hr\/?page_id=433"},"modified":"2023-02-14T11:00:30","modified_gmt":"2023-02-14T11:00:30","slug":"otherservices","status":"publish","type":"page","link":"https:\/\/ysa.hr\/index.php\/otherservices\/","title":{"rendered":"Other services"},"content":{"rendered":"\n\n\n\n\r\n<h2><span style=\"color: #ffffff;\">\u2022 Transport and shipment survey<\/span><\/h2>\r\n\n<p align=\"justify\"><span style=\"color: #ffffff; font-size:20px;\">These surveys are carried out when a yacht is about to be transported either by road or ship.<\/span><\/p>\n<p align=\"justify\"><span style=\"color: #ffffff; font-size:20px;\">Our role in these type of survey is to provide independent record of condition of the yacht at the time of shipping and to ensure the method of lifting, supporting and securing of the yacht being transported.<\/span><\/p>\n<p align=\"justify\"><span style=\"color: #ffffff; font-size:20px;\">By contacting us we can provide you a brief checklist of the yacht preparation for transport.<\/span><\/p>\n\n\n\n\n\n\n\n\n\n\n\r\n<p>n<\/p>\r\n\n\n\n\n\r\n<h2><span style=\"color: #002b50;\">\u2022 Supervisory Survey<\/span><\/h2>\r\n\n\r\n<p align=\"center\"><span style=\"color: #002b50;\"><em>(yard and refit work supervision, maintenance and repair supervision)<\/em><\/span><\/p>\r\n\n<p align=\"justify\"><span style=\"color: #002b50; font-size:20px;\">We provide assistance and supervisory service in a major refit process by monitoring works in key stages. <br> \nThe objective of our surveyor is to independently verify that the work is being completed to the requisite level. <br> \nThe requisite level is determined by the original contract covering the work. If possible, it is beneficial that the surveyor is involved at the contract stage to ensure adequate quality controls are put in place.<\/span><\/p>\n<p align=\"justify\"><span style=\"color: #002b50; font-size:20px;\">A detailed and specific contract, in terms of the work and quality levels required, will put the client in a strong position if the<br \/> \nwork is substandard.<\/span><\/p>\n\n\n\n\n\n\n\r\n<h2><span style=\"color: #ffffff;\">\u2022 Yacht delivery<\/span><\/h2>\r\n\n<p align=\"justify\"><span style=\"color: #ffffff; font-size:20px;\">We offer \u2018door-to-door\u2019 yacht transfer services that include an experienced crew that meets all certification, safety and reliability requirements.<\/span><\/p>\n<p align=\"justify\"><span style=\"color: #ffffff; font-size:20px;\">If you need to move your boat from one location to another feel free to contact us to get tailored solution which meets your requirements. With a professional crew, you leave nothing to chance.<\/span><\/p>\n<p align=\"justify\"><span style=\"color: #ffffff; font-size:20px;\">Our crew bring with them sufficient nautical miles, have the necessary qualifications according to STCW and European standards, as well as experience in different areas with a variety of different types of vessels.<\/span><\/p>\n\n\n\n\n\n\n\n\n\n\n\n<h2><span style=\"color: #002b50ff;\">\u2022 Safety equipment<\/span><\/h2>\n<p align=\"justify\"><span style=\"color: #002b50ff; font-size:20px;\">We provide the service of checking and recommending safety equipment in accordance with the intended use of the yacht. Our recommendations are guided by the requirements of the flag state for a certain length, number of passengers and tonnage of the yacht. The level of equipment varies and depends of lots of pertinent factors. <br \/> Feel free to contact us for additional details.<\/span><\/p>\n\n\n\n\r\n<p>n<\/p>\r\n\n\n\n\n\n\n\n\n<h1><span style=\"font-size: 25px;\">\u2022<\/span><font color=\"#FFFFFF\"><span style=\"font-size: 25px;\"><strong>&nbsp;Yacht preparation for survey<\/strong><\/span><\/font><\/h1>\n<p style=\"text-align: justify; font-size: 20px; color: rgb(255, 255, 255);\">In order for the survey to be effective there are some basic procedures that should be fulfilled before the survey starts. Logistic preparation of the yacht organized by owner or responsible person will contribute to enhance quality of the survey process.<br><\/p>\n\n<span style=\"align:justify;\">Main contact information of the owner, broker, agent or responsible person<\/span>\n<span style=\"align:justify;\">List of persons attending survey should be provided. Attn. to a limited number of persons which are appropriate to be on board during survey process.<\/span>\n<span style=\"align:justify;\">Lifting and lowering service (shipyard, dry-dock) appointment for the yacht should be arranged according to the survey schedule<\/span>\n<span style=\"align:justify;\">Underwater part of the yacht should be pressure washed and clean of marine growth for the underwater survey. Owner should provide permission to scrape anti-fouling paint patches as needed<\/span>\n<span style=\"align:justify;\">For the vessel lifted ashore, the surrounding area should be clear, safe and appropriate to work in. Adequate boarding ladders should be provided and secured.<\/span>\n<span style=\"align:justify;\">The yacht\u2019s compartments and lockers should be accessible and personal items should be removed.<\/span>\n<span style=\"align:justify;\">The yacht should be properly and fully ventilated prior to survey<\/span>\n<span style=\"align:justify;\">On the day of survey all \u2018works in progress\u2019 on the yacht should be stopped<\/span>\n<span style=\"align:justify;\">All relevant documentation and certification should be accessible to surveyor on board (i.e. certificate of Registry, insurance, log book, safety eq. certificates, owner\u2019s manual, maintenance and repair history documentation, etc.)<\/span>\n<span style=\"align:justify;\">The owner should organize certified crew to operate the yacht and yacht\u2019s systems during sea trials<\/span>\n<span style=\"align:justify;\">The owner should ensure that there is sufficient amount of fuel on board to carry out the sea trial test<\/span>\n<span style=\"align:justify;\">The owner should organize all preparations and obtain permits from the marina and\/or port authorities for the trial test at sea<\/span>\n<span style=\"align:justify;\">The complete survey process is carried out in accordance with HSE requirements and any breach of these requirements is subject to the suspension of the inspection until the conditions for safe work are met. HSE \u2013 health, safety and environment.<\/span>\n\n\n\n\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"pagelayer_contact_templates":[],"_pagelayer_content":"","footnotes":""},"class_list":["post-433","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/ysa.hr\/index.php\/wp-json\/wp\/v2\/pages\/433","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ysa.hr\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/ysa.hr\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/ysa.hr\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ysa.hr\/index.php\/wp-json\/wp\/v2\/comments?post=433"}],"version-history":[{"count":73,"href":"https:\/\/ysa.hr\/index.php\/wp-json\/wp\/v2\/pages\/433\/revisions"}],"predecessor-version":[{"id":1773,"href":"https:\/\/ysa.hr\/index.php\/wp-json\/wp\/v2\/pages\/433\/revisions\/1773"}],"wp:attachment":[{"href":"https:\/\/ysa.hr\/index.php\/wp-json\/wp\/v2\/media?parent=433"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}